Happy belated Australia Day to all! We spend the day by the pool and BBQ, very relaxing!
Today started with a 7am site visit for the mirror splash back to have its template made and the the shutter guy to do his final check measure.
Our supervisor is on leave till tomorrow so his supervisor met us on site to open up.
I didn't get any pics today but its looking great as the cleaner has been through.
Apparently the window service and fly screens happen today as well as all the siliconing. The site clean is booked for Monday and so is the painter to do touch ups.
Red spots have started to go on and all going well we'll have an unofficial walk through Monday afternoon with our supervisor. Then apparently PC is the 8th and depending on how much needs to be done we may not get handover until the 22nd! Wasn't too happy to hear that but he said to sort that out further with our supervisor. Hopefully it will be sooner depending on the bank!
Rain water tank (surfmist, a lot lighter/ whiter than we expected) delivered but not hooked up yet.
Origin has installed the gas meter too.
Probably wont have anything else to post until Monday evening so have a great weekend everyone :-)