We've been wrapped & roughed-in!

Went to the block yesterday after work and were VERY excited to see the roof finished, the electrical and plumbing rough-ins done and its been wrapped! They have also been through and done their QA check as there were a few things spray painted in yellow to be fixed up.

We're really happy with how it's looking and with their speedy progress now :)
As far as we know the windows go in on Friday. I think we're going to request a walk through with the supervisor before the plasterboard goes on just to be sure everything is ok. Im also going out on the weekend to photograph every wall for future reference!




 Kitchen


 800h wall frame missing at the back of the study!
 All that data cable in the garage!

 Shower shelf height not quite right and needs to be fixed up
 Window in the ensuite between the basins
 Really looking like a house now!